Aug-25 Construction Update

  • Writer: Maverick_Mordialloc
    Maverick_Mordialloc
  • Aug 31
  • 1 min read

Works completed:

  • Excavation trenching for strip footings

  • Reinforced steel footings cages placed in trenches

  • Concrete strip footing foundations poured

  • Sewer & Water LPOD connections established

 
 
 