top of page

Sep-25 Construction Update

  • Writer: Maverick_Mordialloc
    Maverick_Mordialloc
  • Sep 30, 2025
  • 1 min read

Works Completed:

  • Pre-cast installation and propping for WH10-15

  • Structural steel works to brace pre-cast panels ahead of installation of mezzanine and roof structure

  • Reinforced steel footings cages placed in trenches for WH16-27 backfilled with concrete to form strip footings

 
 
 

Comments


bottom of page